Blyth turbines again.
Posted by Lizabeth on Monday, 08 January 2007 22:14:44
Neither Blyth onshore or offshore wind turbines are working as expected.
Some clarification on the earlier blog today follows. My apologies.
Blyth Harbour (These are on the pier 9 X300kW)
I have read Blyth harbour (onshore turbines 9 X 300kW) are to be increased in capacity
In 2005 their load factor was 13.3% not the anticipated 30%
Blyth Offshore (These are in the harbour 2 X 2000 kW)
In 2005 one turbine was out of action for 8 months and the second turbine seems not to have worked at all. In fact I can not locate any registered ROC s at all on the Ofgem website for the second turbine
onshore, offshore, ROCs, blyth wind turbines